PLC Retrofit & Replacement in Tampa

End-of-life processors, replaced right: PLC-5, SLC 500, and other discontinued platforms upgraded to a modern, documented, UL 508A system.

or call 727-221-9368
Allen Bradley

When the processor dies, the line stops

If you’re searching for a PLC retrofit or PLC replacement, something has probably already gone wrong, or you’ve realized it’s about to. The most common trigger we see: a processor fails, the part is discontinued, and the only source is a gray-market reseller quoting a 4-8 week lead time on a used unit nobody can warranty. The second most common trigger: an insurance audit or new plant manager notices a control platform running on hardware Rockwell hasn’t sold in over a decade, with no backup of the program and no one left on staff who wrote it.

Either way, an obsolete PLC isn’t just an aging part. It’s a single point of failure with no spare on the shelf, sitting on a line that makes money every hour it runs.

What we do

We replace end-of-life processors (PLC-5, SLC 500, Modicon 984, GE 90-30, Siemens S5) with a current, supported platform (Allen-Bradley/Rockwell, Siemens TIA Portal, Beckhoff/TwinCAT, or Codesys-based, depending on what fits your plant). Every retrofit includes a new UL 508A listed panel, full documentation (BOM, wiring diagrams, I/O schedule, as-built drawings), and on-site commissioning so the line comes back up on schedule. Where it makes sense, we preserve your existing logic and re-platform it rather than rewriting from scratch, which keeps cost and changeover risk down.

Why ICS?

UL 508A Certified

Every panel we build is fabricated and labeled to UL 508A standard, in-house.

Local Largo Shop

Pinellas County shop with fast turnaround, with no shipping panels across the country.

CAD Through Commissioning

Design, fabrication, and on-site startup, all under one roof, one point of contact.

How it works

1

Retrofit Assessment

We walk the plant, inventory every control platform, and hand you a written report: what’s obsolete, what a failure would cost, and what we’d recommend.

2

Written Scope

A fixed-price proposal for the retrofit, with a schedule that works around your production calendar.

3

Build, Install, Commission

Panel built and tested in our Largo shop, installed on your timeline, commissioned on-site with your team.

Frequently asked questions

In most cases, yes. We evaluate whether to migrate the existing program or rebuild it during the assessment, and price both options.

A single-machine retrofit is often a 2-4 week build once we’ve scoped it, with installation scheduled around a planned outage window.

Yes. Siemens, Beckhoff, Yaskawa, Omron, Unitronics, and most legacy platforms including Modicon, GE, and Square D.

Snap a photo of the nameplate and send it to us

We’ll start scoping your Retrofit Assessment before we even schedule a visit.